Projects

HUGH MUNRO PROJECT PORTFOLIO

fw2016site

WINNIPEG FLOODWAY C3A

This project’s scope of work consisted of the Main Floodway Channel excavation, perimeter ditching, temporary erosion control measures, and revegetation.

cpt2016site

CENTREPORT CANADA WAY (CCW)

The project involved the design and build of grade separations for the CCW transporation corridor in the Northwest quadrant in the City of Winnipeg, RM of Rosser and RM of Headingley.

esra2016site

EAST SIDE ROAD AUTHORITY PR304

This project’s work consisted generally of the construction of a new all-season road from PR304 (KM55.2) for a total of approximately 11.8 kilometers to KM67.0, Berens River.

lstm2016site

LAKE ST. MARTIN REACH 3

This project’s work involved construction of the Lake St. Martin Emergency Channel “Reach 3”, from Buffalo Creek to West of Lake Winnipeg. The project included construction of access, channel construction, dike construction and inlet cofferdam construction.